Skip to main content

Spaceway undertakes warehouse fit-outs for each of Stone Bridge United’s six premises

Case studies

July 2013

By Charlie Jeary
Director, Owner - Winchester, Hampshire

Charlie Jeary

Spaceway recently completed the fit-outs of six warehouse units for Stone Bridge United Ltd, and is already working on the next warehouse.

Each of the units is comprised of the installation of varying storage systems. These include mezzanine floors with suspended ceilings, lighting and smoke detection, high bay narrow aisle pallet racking systems, longspan shelving systems and new fire doors between units.

The units have been fitted out over a period of several months, and Spaceway has worked closely with Stone Bridge along the way with everything from design to completion of each warehouse. This ensured minimal impact on the day-to-day running of the business.

Each unit was completed on time and to budget, and Spaceway is now working on the seventh.