Project Scope
Project: Portion Factory Mezzanine Floor
Complexity: High, due to multiple floors, heavy load requirements, and integrated walkways
Design Requirements:
- Three large floors interconnected with walkways
- Heavy-duty flooring to accommodate significant weights and activities
- Specialised apertures for seamless integration of pipework to machines below